An electric fence is a compliance job
JVA is what we install. The energiser is the easy part. The file that gets the fence accepted is the work.
Treat it as a perimeter project
Walk the boundary. Mark gates, slopes, trees and existing mesh. Agree warning signs and height. Decide who holds the keys for isolation during maintenance.
What the client should expect in the file
Make, model and location of the energiser. Zone or sector lengths. Warning-sign positions. Isolation / earth notes. Test readings at handover. Who to call when a strand is down.
Exact authority forms change. We prepare the installer-side documents that Sarawak inspections typically ask for, then walk you through submission — we do not pretend the form number never updates.
What we will not do
Energise a fence with no signs. Hide the energiser where nobody can isolate it. Quote per metre without a site walk.
After handover
Vegetation and loose strands cause most callbacks. Put the fence on an AMC visit, especially on factory lots. See maintenance plans.