What ICT & Network Project in Sarawak covers
Plan the ICT network from user endpoints through labelled cabling, switching and the agreed uplinks. HJ defines the cabinet, patching, connectivity tests and handover around the client's network policy; this engineering capability describes proposed delivery, not proof of a finished customer network.
It sits in ICT under Engineering Package. The final deliverable is shaped by the intended outcome, the installed or proposed environment and the interfaces that must be owned, supplied, integrated and tested.
When to use this page
Endpoint and area plan, existing cable/port schedule, switch/uplink details, client network policy, IT owner and acceptance tasks.