Skip to main content
Aerial scene of connected commercial and residential buildings at dusk (illustration)
For consultants & developers

ELV Contractor for Developers & Consultants in Sarawak

Forward this page. It is the scope we actually install on Kuching apartments and hotels — not a product catalogue.

Representative industry-system CanvasDeveloper coordination path
Representative system illustration for Developer coordination path (illustration)
Representative conceptual illustration for this site type. The page's multi-system scope, quantities, interfaces and regulated responsibilities remain subject to assessment and approval.
Developer coordination path
  1. 01Project brief
  2. 02Design coordination
  3. 03Commissioning
  4. 04Handover

Grade

CIDB G5. CIDB's published grade limit is not more than RM5 million per project. Current registration category, specialisation and tender eligibility must still be checked against the tender documents.

Base

Kuching team, own technicians. Sibu, Bintulu and Miri on a scheduled crew — Sibu and Miri already covered on Linde Gas.

Handover

Survey, design, wiring, commissioning, training, AMC. One WhatsApp number after completion.

Apartment / condo stack

Intercom · door access · lift access · barrier / LPR · SMATV / MATV · CCTV · FTTH / structured cabling · PA where specified.

Reference buildings: Fulton Park, Toorak Park, Yarra Park, Podium, Gala Residences.

Developers and groups we have worked with: Tecktonic & Sons — CCTV, intercom and video intercom, lift access control, fibre, SMATV and projector; Chen Ling Group (The Podium) — CCTV, intercom and video intercom, lift access control, fibre and SMATV; Cahya Mata (CMS) — main switchboard (MSB) electrical works at three Sarawak sites (2026).

Hotel / hospital / government

Hilton Kuching boom gate, barrier gate and autopay parking system. Sarawak General Hospital door access. HJ's company profile also lists MBKS, KUTS / Sarawak Metro, JKR and Immigration references, but this page does not claim their unpublished system scope or point lists.

Consultant-ready delivery information

At tender and coordination stage, define the exact HJ deliverables: design responsibility, equipment and material submittals, builder's-work requirements, containment and power interfaces, cable and point schedules, network addressing, shop drawings, testing method, witnessing, defect close-out, as-built records, O&M information, training and warranty. Items not included in the accepted scope stay visibly excluded instead of being assumed.

CIDB's project-handover competency guidance treats inspection, testing and commissioning, defect lists, as-built drawings, O&M manuals and warranties as separate handover evidence. See the official CIDB project-handover reference. HJ maps the applicable records to the actual contract rather than copying a generic checklist into every project.

What we will not do

No price without a survey. No mixing random brands on a life-safety door. No publishing camera maps for government or healthcare.

WhatsApp the project All named projects

Industry → Solution

See the complete HJ solutions that can serve this industry

An industry outcome may combine several systems. Use these diagrams to understand each system boundary, then confirm the functions and quantities required for the actual site.

HJ ELV Complete blueprint: selected video, access, perimeter, network, media
Complete system diagram

Complete ELV System Packages for Buildings

Coordinates selected ELV systems through one scope matrix, interface plan, test plan and handover responsibility.

Position in the diagram
  1. Network & Media

Planning connection: Agree network, Wi-Fi and media requirements before tender: spaces served, outlets, interfaces and the carrier boundary. The master diagram is a coordination aid; provider services and final quantities need separate confirmation.

Open component 04 in the complete Solution →