Choose the mounting to suit the space
Wall-mount, hanging and floor-standing frames suit different rooms. The right choice depends on the wall, ceiling, weight and viewing position.
HJ SECURITY · KUCHING & SARAWAK
The frame behind an LED wall decides how safe, flat and serviceable it is. HJ plans the mounting type, power, ventilation and maintenance access with the display, and coordinates with the structural engineer where the building or approvals require one.
THE STARTING POINT
Wall-mount, hanging and floor-standing frames suit different rooms. The right choice depends on the wall, ceiling, weight and viewing position.
Front or rear access, walkway space and power isolation are decided up front, so a module can be replaced without taking the wall apart.
Loads, fixings and any outdoor wind or weather exposure are reviewed, with a qualified engineer involved where required.

SYSTEMS & SCOPE
Choose the areas that match your priorities, then confirm how they work together. Open a topic for related installation or service information.
Cabinet size, weight and service access for indoor LED walls.
Wall layout, bezel-free joins and flatness across the cabinets.
Outdoor frames add weather, wind and corrosion considerations.
Rack space and cable route planned together with the frame.
Dedicated power, isolation and protection for the display, quoted as an electrical scope.
Signal and network cabling routed through the frame and labelled.
UPS for the controller and, where agreed, the display.
Surge protection and earthing for outdoor displays and their cables.
Cameras for expensive displays in public or shared areas.
Module replacement, repairs and checks on an installed wall.
Scheduled checks for displays that must stay on.
BEFORE THE QUOTATION
Cabinet count and total weight.
Indoor, outdoor, shopfront or hall.
Front or rear service and walkway space.
Building, landlord or authority requirements.
USEFUL ANSWERS
HJ plans the mounting and coordinates the installation. Where the building or authority requires structural design or approval, a qualified engineer is involved and the requirement is confirmed during the assessment.
Many indoor walls can be, depending on the cabinet type. Front or rear service access is decided during planning so modules can be replaced without dismantling the wall.
Possibly. The assessment checks the cabinets, frame, power and cabling first, then confirms what can be reused.
Outdoor displays face weather, wind, heat and surge risk. These are reviewed during the assessment and reflected in the scope.
Share the display size, the location and a photo of the wall or space. We will review the requirements and confirm the next step.