Skip to main content

HJ SECURITY · KUCHING & SARAWAK

Security for unmanned substations and utility compounds.

Plan perimeter detection, CCTV, access control and remote monitoring around unmanned sites, long boundaries and the operator's permit-to-work rules. HJ reviews security and ELV requirements for substations and utility compounds across Sarawak.

THE STARTING POINT

Start with the everyday problem.

Detect at the boundary

Long fence lines need detection and verification before anyone drives out to an unmanned site.

Control who enters

Staff and contractor entry should follow the permit-to-work process, with records the operator can review.

Keep monitoring running

Remote links, backup power and equipment health have to hold up through outages and bad weather.

SYSTEMS & SCOPE

Connect the right parts of the scope.

Choose the areas that match your priorities, then confirm how they work together. Open a topic for related installation or service information.

Perimeter detection

Fence-line detection, infrared beams or sensor cable chosen for the boundary length, terrain and nuisance-alarm risk.

Electric fence

Energised perimeter fencing with zoned alarms where the boundary and the operator's requirements allow it.

Thermal & long-range CCTV

Thermal and long-range cameras for dark compounds and long fence lines, with verification images on alarm.

CCTV & recording

Coverage of gates, control buildings and yards, with recording sized to the required retention.

Access control

Card, PIN or face access for control rooms and equipment buildings, with an entry record for each person.

Contractor & visitor records

Contractor registration and entry records matched to the permit-to-work arrangement.

Gate & vehicle entry

Motorised gates or barriers with plate capture and remote release where the site requires it.

Gate intercom

Gate and help-point intercoms so visitors and crews can reach the control room.

Multi-site monitoring

One view of alarms, cameras and access events across many unmanned sites.

Site connectivity

Fibre, 4G, wireless or Starlink backhaul selected for each location, with failover where needed.

Backup power

UPS and battery runtime for security equipment, so alarms and recording continue during a supply interruption.

Equipment-room monitoring

Temperature, humidity and water-ingress alerts for equipment rooms and outdoor cabinets.

Solar & 4G cameras

Solar-powered cameras with 4G where a suitable power or network point is not available.

Wireless bridge

Point-to-point links between the gate, control building and camera poles.

Lightning & surge protection

Surge protection and earthing for poles, cameras and network equipment in exposed compounds.

See also: Telecom tower and BTS site security

Planning that fits the site.

New site or upgrade programme

  • Provide the site plans, boundary lengths and the operator's security specification.
  • Confirm permit-to-work, induction and escort requirements before any site visit.
  • Agree which alarms, video and records must reach the control room.

Existing sites

  • Provide an authorised contact and access arrangements for each site.
  • Review existing cameras, fence detection, links and backup power.
  • Prioritise sites and agree a rollout sequence.

BEFORE THE QUOTATION

What changes the scope and cost?

Boundary

Fence length, terrain and gate openings.

Remote links

Backhaul, failover and the monitoring centre.

Site rules

Permits, escorts and work windows.

Sites

Number of sites and the rollout sequence.

Prepare a clear quotation brief

USEFUL ANSWERS

Questions before you start.

Does HJ work on high-voltage equipment?

No. HJ's scope is security and ELV systems. Any work in or near energised equipment follows the operator's permit-to-work, safety clearance and supervision rules, and the high-voltage equipment itself stays outside HJ's scope.

Can alarms from many unmanned substations go to one control room?

Yes, where the links and the monitoring platform allow it. Event types, video verification and who responds are agreed for each site before alarms are routed.

What happens when the power or the link goes down?

Backup power and failover links are sized for the agreed runtime, and the system can raise a power-fail or link-loss alarm so the operator knows a site is offline.

Can existing fence detection or cameras be reused?

The assessment checks condition and compatibility first. Equipment is retained where it meets the agreed requirements.

Plan your next step with HJ.

Share the number of sites, their locations and the problem you want to solve. We will review the requirements and confirm the next step.