Skip to main content
Closed electrical metering cabinet with power meters and monitoring gateway (illustration)

Multi-Circuit / Tenant Metering in Kuching & Sarawak

Separate agreed circuit or tenant readings in a metering dashboard. Circuit identity, shared loads, meter accuracy, ratios, timestamps and allocation rules are confirmed; a monitoring report is not automatically an approved billing system.

System selection and integration guideSmart Energy
EnergyMulti-Circuit / Tenant Metering
Multi-Circuit and Tenant Metering system diagram
  1. 01Multi-Circuit / Tenant Metering
  2. 02Sensor placement, thresholds and alerts
  3. 03Field interface
  4. 04meter comparison and CT direction
Conceptual Multi-Circuit / Tenant Metering product and system illustration.
Illustration & scope boundary

Conceptual Multi-Circuit / Tenant Metering product and system illustration for Energy. Final device form, model, interfaces and quantities are confirmed from the assessed scope and approved product data. Conceptual measure, alert and respond loop for Multi-Circuit / Tenant Metering, derived from this page's scope, interfaces and acceptance record.

Conceptual planning path — not an as-built drawing or project photograph.

What Multi-Circuit / Tenant Metering covers

Separate agreed circuit or tenant readings in a metering dashboard. Circuit identity, shared loads, meter accuracy, ratios, timestamps and allocation rules are confirmed; a monitoring report is not automatically an approved billing system.

It sits in Smart Energy under Energy. The final deliverable is shaped by the intended outcome, the installed or proposed environment and the interfaces that must be owned, supplied, integrated and tested.

When to use this page

Separate agreed circuit or tenant readings in a metering dashboard. Circuit identity, shared loads, meter accuracy, ratios, timestamps and allocation rules are confirmed; a monitoring report is not automatically an approved billing system. Map each tenant, circuit and shared load to its meter. Confirm transformers and ratios, timestamps, supported accuracy, allocation method and who validates readings before any separately authorised billing use.

Typical environments to assess

  • Commercial electrical metering
  • Factories and agreed circuit monitoring
  • Tenant and shared-load dashboards
  • Compatible meter-to-BMS integrations

Engineering SOP & Handover Checklist

From the initial brief to the handover record: what to prepare, check and confirm with HJ.

01

Operational Purpose & Workflow

Define Energy as the operating result for Multi-Circuit / Tenant Metering, including the users, process and exceptions it must serve.

Separate agreed circuit or tenant readings in a metering dashboard. Circuit identity, shared loads, meter accuracy, ratios, timestamps and allocation rules are confirmed; a monitoring report is not automatically an approved billing system.

02

Pre-Attendance Evidence

For Multi-Circuit / Tenant Metering, confirm metering objective and circuits, CT or meter class and ratio, sampling, tariff, dashboard, BMS and billing boundary.

Map each tenant, circuit and shared load to its meter. Confirm transformers and ratios, timestamps, supported accuracy, allocation method and who validates readings before any separately authorised billing use.

03

Diagnostic & Testing Path

Map Sensor, meter or command → Control & integration logic → Field interface → Dashboard, trend & handover for Multi-Circuit / Tenant Metering and identify every interface owned by HJ, the customer, ISD supply or an appointed specialist.

04

System & Responsibility Boundary

Monitoring supports analysis but is not revenue billing unless approved metering and governance are specified; CT installation and isolation are electrical works. Final models, capacities and quantities still follow survey, compatibility and availability.

Shared loads, circuit mapping and metering assumptions affect allocation. A tenant dashboard is not automatically approved for billing; meter suitability and the allocation or tariff rules require separate owner verification.

05

Acceptance & Handover Record

For Multi-Circuit / Tenant Metering, record meter comparison and CT direction, demand or threshold event, trend, export and circuit mapping; also agree point-to-point function test, scene, schedule, trend or alarm test, backup, export and operator handover before handover.

Compare agreed meter and dashboard points for units, scaling, circuit identity and timestamps. Check trends, communication-loss indication and any configured alerts; record assumptions and ownership without changing protective settings.

Engineering Scope, Regulatory & Service Boundaries

Responsibility and evidence boundary

HJ coordinates assessment, engineering, installation, integration, testing and lifecycle support only for the scope recorded in the quotation. ISD handles catalogue, model, datasheet, supply and availability enquiries. Customer, consultant, builder and appointed-specialist responsibilities remain explicit.

Final scope, quantities, compatibility, access, programme, availability and responsibility are confirmed during assessment and quotation.

This focused topic remains connected to its complete system owner. Final models, quantities, interfaces and included work are confirmed in the assessed quotation.

Questions before proceeding

Use the answers as a planning boundary; site conditions and written scope remain decisive.

What should be confirmed for Multi-Circuit / Tenant Metering?

Map each tenant, circuit and shared load to its meter. Confirm transformers and ratios, timestamps, supported accuracy, allocation method and who validates readings before any separately authorised billing use.

What are the limits of this scope?

Shared loads, circuit mapping and metering assumptions affect allocation. A tenant dashboard is not automatically approved for billing; meter suitability and the allocation or tariff rules require separate owner verification.

What should be checked before handover?

Compare agreed meter and dashboard points for units, scaling, circuit identity and timestamps. Check trends, communication-loss indication and any configured alerts; record assumptions and ownership without changing protective settings.

Planning Multi-Circuit / Tenant Metering? Tell HJ about your site

Tell us where it will be used, what it needs to do and what equipment you already have. HJ will recommend the right system, explain who is responsible for what, and agree the next step with you.